⬆ Please fill User, Plant and Program above and press Load to start.
General
Production count OEE
Shift duration minus scheduled breaks.
Real time the shift ran – can extend beyond plan to compensate for stops.
Passed first time, no rework.
Required rework, now OK.
Actual; can be filled from Cycle time tab.
Auto-filled from master data per machine.
⚠Plausibility check.
Live calculation
Achievement
–
Availability
–
Performance
–
Quality
–
FPY
–
First pass yield
Rework rate
–
JpH
–
Good parts per hour
OEE
–
Availability × Performance × Quality
Quality Defect
Multiple allowed
Live calculation
Total defects
0
Defect rate
–
PPM
–
Line stopped? *
Take or select photoautomatically compressed (1280px, JPEG 80%)
Note Free text
Take or select photoautomatically compressed (1280px, JPEG 80%)
Measurement context FROM CAPTURE
Mirrors the Capture tab. Change there to retag this measurement.
Target CT
–
From master data
Runs recorded
0
0 included · 0 excluded
00.00
Ready
Statistics Live
Cycle avg
–
0 runs included
Min
–
Max
–
Delta to target
–
Set Target CT in master data
Cumulative downtime
0 min
0 events included
Recorded entries
No entries yet. Press Start to record one.
Recent entries
Power Automate Webhook
Auto-loaded from the plant preset. Not user-editable. To change, update the preset in the master data Excel.
User
Shown on every log entry for traceability. Use the operator's real name or initials.
Select in the Quick context bar at the top of the screen.
Master data – Shifts EDITABLE
Comma-separated. Each value becomes one option in the Shift dropdown.
Master data – Plant hierarchy EDITABLE
Pressing Load in the Quick context bar replaces these with the preset for that plant. Edit here to add custom entries for the current plant. Save with the button at the bottom.
Comma-separated.
One per row. Format: name | component
One per row. Format: name | line | component | targetCT(sec) | capacity
One per row. Format: componentName: version1, version2, …